CAIRO INT'L AIRPORT HANGAR 3

Projekt-Highlights
- Jahr der Fertigstellung
- 2020
- Standort
- Cairo, Egypt
- Industriebereich
- Aviation & Logistics
- Implementiertes System
- HIGH EXPANSION FOAM
Compliance und Zulassungen
Umfassende technische Fallstudie
Luftfahrtsektor — Hangarschutz
Comprehensive high-expansion foam system for wide-body aircraft maintenance hangar. Capable of filling the hangar to 1.5m depth in 2 minutes.
Die technische Herausforderung
Providing fire suppression for a 15,000 sqm hangar housing Boeing 777 and Airbus A330 aircraft. The challenge was to cover the immense volume and shadow areas under aircraft wings where fuel spills might ignite.
Die technische Lösung
Installed a grid of ceiling-mounted High-Expansion Foam Generators fed by a central pumping station. The system utilizes Meteory's AFFF 3% foam concentrate, designed to expand 500:1, blanketing the entire floor area rapidly to starve oxygen from potential fuel fires.
Betriebsergebnis und Wirkung
Full-scale discharge test demonstrated complete floor coverage within 1.8 minutes, exceeding NFPA 409 requirements. The system provides failsafe protection for assets valued over $500 million.
