EL-BURULLUS POWER PLANT

EL-BURULLUS POWER PLANT

Projekt-Highlights

Jahr der Fertigstellung
2018
Standort
Kafr El Sheikh, Egypt
Industriebereich
Industrie
Implementiertes System
CO2 SYSTEMS

Compliance und Zulassungen

NFPA CompliantZivilschutz ZertifiziertÄgyptisches GütesiegelISO 9001:2015

Umfassende technische Fallstudie

Energiesektor — Schutz kritischer Anlagen

Design and installation of high-pressure CO2 systems for turbine enclosures and transformer protection in one of the world's largest combined-cycle power plants.

Die technische Herausforderung

Protecting 12 gas turbines and critical electrical infrastructure in a high-temperature, high-vibration coastal environment where saltwater corrosion is a constant threat.

Die technische Lösung

Implemented a redundant High-Pressure CO2 system using seamless steel cylinders with marine-grade electrostatic coating (RAL 3000). The system features zoned release valves and integrated heat detection to ensure rapid suppression without thermal shock to the turbines.

Betriebsergebnis und Wirkung

Achieved 100% successful commissioning tests with discharge times under 60 seconds. The installation passed all Civil Defense and NFPA 12 compliance checks, securing continuous power generation for 4.8 GW capacity.

Installierte Technologien und Ausrüstung

High-Pressure CO2Heat DetectionZoned Release Control
Von Meteory zertifizierte Industrieinstallation