Automatic water spray system for 500kV transformers ensuring rapid cooling and suppression.

Die technische Herausforderung

Protecting strategic 500kV oil-filled transformers in a high-density urban infrastructure project. The risk of oil explosions and cascaded failure required an immediate response system.

Die technische Lösung

Designed a Deluge Water Spray System utilizing galvanized steel piping rings surrounding each transformer. High-velocity nozzles are strategically aimed to cool the transformer tank and extinguish oil fires simultaneously. Activated by linear heat detection cables.

Betriebsergebnis und Wirkung

System successfully effectively isolates fire risks, preventing catastrophic damage to the grid backbone. Commissioned ahead of schedule to support the New Capital's inauguration.

Installierte Technologien und Ausrüstung

Deluge Valve SetsHigh Velocity NozzlesLinear Heat Detection