Meteory

EL-BURULLUS POWER PLANT

EL-BURULLUS POWER PLANT

Aspectos Destacados del Proyecto

Año de Finalización
2018
Ubicación
Kafr El Sheikh, Egypt
Segmento Industrial
Industrial
Sistema Implementado
CO2 SYSTEMS

Cumplimiento y Aprobaciones

NFPA CompliantCertificado por Defensa CivilMarca de Calidad EgipciaISO 9001:2015

Estudio de Caso de Ingeniería Integral

Sector Energía — Protección de Infraestructura Crítica

Design and installation of high-pressure CO2 systems for turbine enclosures and transformer protection in one of the world's largest combined-cycle power plants.

El Reto Técnico

Protecting 12 gas turbines and critical electrical infrastructure in a high-temperature, high-vibration coastal environment where saltwater corrosion is a constant threat.

La Solución de Ingeniería

Implemented a redundant High-Pressure CO2 system using seamless steel cylinders with marine-grade electrostatic coating (RAL 3000). The system features zoned release valves and integrated heat detection to ensure rapid suppression without thermal shock to the turbines.

Resultado e Impacto Operativo

Achieved 100% successful commissioning tests with discharge times under 60 seconds. The installation passed all Civil Defense and NFPA 12 compliance checks, securing continuous power generation for 4.8 GW capacity.

Tecnologías y Equipos Instalados

High-Pressure CO2Heat DetectionZoned Release Control
Instalación Industrial Certificada por Meteory