NEW CAPITAL SUBSTATION

NEW CAPITAL SUBSTATION

Aspectos Destacados del Proyecto

Año de Finalización
2022
Ubicación
New Administrative Capital
Segmento Industrial
Industrial
Sistema Implementado
WATER SPRAY

Cumplimiento y Aprobaciones

NFPA CompliantCertificado por Defensa CivilMarca de Calidad EgipciaISO 9001:2015

Estudio de Caso de Ingeniería Integral

Sector Energía — Protección de Infraestructura Crítica

Automatic water spray system for 500kV transformers ensuring rapid cooling and suppression.

El Reto Técnico

Protecting strategic 500kV oil-filled transformers in a high-density urban infrastructure project. The risk of oil explosions and cascaded failure required an immediate response system.

La Solución de Ingeniería

Designed a Deluge Water Spray System utilizing galvanized steel piping rings surrounding each transformer. High-velocity nozzles are strategically aimed to cool the transformer tank and extinguish oil fires simultaneously. Activated by linear heat detection cables.

Resultado e Impacto Operativo

System successfully effectively isolates fire risks, preventing catastrophic damage to the grid backbone. Commissioned ahead of schedule to support the New Capital's inauguration.

Tecnologías y Equipos Instalados

Deluge Valve SetsHigh Velocity NozzlesLinear Heat Detection