CAIRO INT'L AIRPORT HANGAR 3

Points Forts du Projet
- Année de Réalisation
- 2020
- Emplacement
- Cairo, Egypt
- Segment Industriel
- Aviation & Logistics
- Système Installé
- HIGH EXPANSION FOAM
Conformité et Approbations
Étude de Cas d'Ingénierie Complète
Secteur Aviation — Protection des Hangars
Comprehensive high-expansion foam system for wide-body aircraft maintenance hangar. Capable of filling the hangar to 1.5m depth in 2 minutes.
Le Défi Technique
Providing fire suppression for a 15,000 sqm hangar housing Boeing 777 and Airbus A330 aircraft. The challenge was to cover the immense volume and shadow areas under aircraft wings where fuel spills might ignite.
La Solution d'Ingénierie
Installed a grid of ceiling-mounted High-Expansion Foam Generators fed by a central pumping station. The system utilizes Meteory's AFFF 3% foam concentrate, designed to expand 500:1, blanketing the entire floor area rapidly to starve oxygen from potential fuel fires.
Résultat et Impact Opérationnel
Full-scale discharge test demonstrated complete floor coverage within 1.8 minutes, exceeding NFPA 409 requirements. The system provides failsafe protection for assets valued over $500 million.
