EL-BURULLUS POWER PLANT

EL-BURULLUS POWER PLANT

Points Forts du Projet

Année de Réalisation
2018
Emplacement
Kafr El Sheikh, Egypt
Segment Industriel
Industriel
Système Installé
CO2 SYSTEMS

Conformité et Approbations

NFPA CompliantCertifié Défense CivileMarque de Qualité ÉgyptienneISO 9001:2015

Étude de Cas d'Ingénierie Complète

Secteur Énergie — Protection des Sites Critiques

Design and installation of high-pressure CO2 systems for turbine enclosures and transformer protection in one of the world's largest combined-cycle power plants.

Le Défi Technique

Protecting 12 gas turbines and critical electrical infrastructure in a high-temperature, high-vibration coastal environment where saltwater corrosion is a constant threat.

La Solution d'Ingénierie

Implemented a redundant High-Pressure CO2 system using seamless steel cylinders with marine-grade electrostatic coating (RAL 3000). The system features zoned release valves and integrated heat detection to ensure rapid suppression without thermal shock to the turbines.

Résultat et Impact Opérationnel

Achieved 100% successful commissioning tests with discharge times under 60 seconds. The installation passed all Civil Defense and NFPA 12 compliance checks, securing continuous power generation for 4.8 GW capacity.

Technologies et Équipements Installés

High-Pressure CO2Heat DetectionZoned Release Control