EL-BURULLUS POWER PLANT

Points Forts du Projet
- Année de Réalisation
- 2018
- Emplacement
- Kafr El Sheikh, Egypt
- Segment Industriel
- Industriel
- Système Installé
- CO2 SYSTEMS
Conformité et Approbations
Étude de Cas d'Ingénierie Complète
Secteur Énergie — Protection des Sites Critiques
Design and installation of high-pressure CO2 systems for turbine enclosures and transformer protection in one of the world's largest combined-cycle power plants.
Le Défi Technique
Protecting 12 gas turbines and critical electrical infrastructure in a high-temperature, high-vibration coastal environment where saltwater corrosion is a constant threat.
La Solution d'Ingénierie
Implemented a redundant High-Pressure CO2 system using seamless steel cylinders with marine-grade electrostatic coating (RAL 3000). The system features zoned release valves and integrated heat detection to ensure rapid suppression without thermal shock to the turbines.
Résultat et Impact Opérationnel
Achieved 100% successful commissioning tests with discharge times under 60 seconds. The installation passed all Civil Defense and NFPA 12 compliance checks, securing continuous power generation for 4.8 GW capacity.