EL-BURULLUS POWER PLANT

EL-BURULLUS POWER PLANT

Caratteristiche Principali

Anno di Completamento
2018
Posizione
Kafr El Sheikh, Egypt
Segmento Industriale
Industriale
Sistema Implementato
CO2 SYSTEMS

Conformità e Approvazioni

NFPA CompliantCertificato Protezione CivileMarchio di Qualità EgizianoISO 9001:2015

Studio di Caso Ingegneristico Completo

Settore Energia — Protezione Critica

Design and installation of high-pressure CO2 systems for turbine enclosures and transformer protection in one of the world's largest combined-cycle power plants.

La Sfida Tecnica

Protecting 12 gas turbines and critical electrical infrastructure in a high-temperature, high-vibration coastal environment where saltwater corrosion is a constant threat.

La Soluzione Ingegnerizzata

Implemented a redundant High-Pressure CO2 system using seamless steel cylinders with marine-grade electrostatic coating (RAL 3000). The system features zoned release valves and integrated heat detection to ensure rapid suppression without thermal shock to the turbines.

Risultato e Impatto Operativo

Achieved 100% successful commissioning tests with discharge times under 60 seconds. The installation passed all Civil Defense and NFPA 12 compliance checks, securing continuous power generation for 4.8 GW capacity.

Tecnologie e Attrezzature Installate

High-Pressure CO2Heat DetectionZoned Release Control