NEW CAPITAL SUBSTATION

Caratteristiche Principali
- Anno di Completamento
- 2022
- Posizione
- New Administrative Capital
- Segmento Industriale
- Industriale
- Sistema Implementato
- WATER SPRAY
Conformità e Approvazioni
Studio di Caso Ingegneristico Completo
Settore Energia — Protezione Critica
Automatic water spray system for 500kV transformers ensuring rapid cooling and suppression.
La Sfida Tecnica
Protecting strategic 500kV oil-filled transformers in a high-density urban infrastructure project. The risk of oil explosions and cascaded failure required an immediate response system.
La Soluzione Ingegnerizzata
Designed a Deluge Water Spray System utilizing galvanized steel piping rings surrounding each transformer. High-velocity nozzles are strategically aimed to cool the transformer tank and extinguish oil fires simultaneously. Activated by linear heat detection cables.
Risultato e Impatto Operativo
System successfully effectively isolates fire risks, preventing catastrophic damage to the grid backbone. Commissioned ahead of schedule to support the New Capital's inauguration.